AV Quote Template: How to Write an AV Quote, With a Worked Example

What goes on an AV quote, how to structure equipment, labor, transport and terms, and a copyable template with a fully worked hypothetical example.

· Stagera Team
av quote quoting av rental proposal template

An AV quote is a priced, dated offer for one job: who it is for, where and when the show happens, what equipment and crew you will supply, what each line costs, and the assumptions the price depends on. A good one groups equipment by department, prices labor by position with a stated hours basis and overtime terms, lists transport, consumables, sub-rentals and any damage waiver as their own lines, and ends with a total, an expiry date and a signature block. The template below is free to copy, with a worked example whose arithmetic you can check.

Terminology varies by shop and by client. Some companies call the same document a quote, an estimate, a proposal or a bid. What follows describes common practice in AV rental and event production, not an industry standard.

What Should an AV Quote Include?

A quote that holds up on show day usually carries these parts:

  • Header. Your company details, the client and the billing contact, a quote number, a revision number, the issue date and the date the price expires.
  • Job details. Event name, venue and room, load-in, rehearsal, show and load-out times, and who owns the job on your side.
  • Scope summary. Two or three sentences in plain words: what you are providing and what you are not.
  • Equipment lines. Grouped by department or by room, with quantity, days, unit rate and line total.
  • Labor lines. By position, with the call, the hours basis, the rate and what happens after the basis runs out.
  • Transport. Trucks, trips, parking and anything billed at cost.
  • Consumables. Tape, batteries and other items that will not come back.
  • Sub-rentals. Gear you are bringing in from another company, kept apart from owned equipment.
  • Damage waiver or insurance line. Your stated position on loss and damage.
  • Discounts. Shown as their own lines, each with a name and the lines it applies to.
  • Subtotal, tax and total. With the deposit amount and due date.
  • Assumptions and terms. Power, rigging, venue access, cancellation, changes and payment.
  • Acceptance. Name, title, signature and date.

For entertainment work, the scope usually starts from the act’s technical rider. For corporate work it starts from an agenda, a floor plan and a site visit.

Quote vs Estimate vs Proposal vs Invoice: What Is the Difference?

These words get used loosely, so separate them by who issues the document, when, and what it is meant to commit. The table describes common business usage. It is not a legal definition, and your client’s purchasing team may use the words differently.

DocumentWho issues itWhenIs the price fixed?What it commits (common usage)
EstimateAV companyEarly, before scope is settledNo. It is an approximation, often a rangeLittle. It signals a likely budget so the client can decide whether to continue
ProposalAV companyDuring the sale, often in a competitive bidUsually priced, sometimes with optionsA recommended approach plus a price. It sells the design as well as stating the cost
QuoteAV companyOnce scope, dates and venue are knownCommonly yes, for the listed scope, until the expiry dateAn offer to supply the listed scope at the listed price on the listed terms
Change orderAV company, approved by the clientAfter acceptance, whenever scope changesYes, for the change onlyAn agreed addition to or removal from the accepted quote, with its own price
InvoiceAV companyAt deposit, and after the showYes. It bills what was agreed plus approved changesA request for payment, not an offer

Whether an accepted quote is a binding contract depends on how it is worded and on local law. Have an attorney review your terms and your acceptance language. This article is general information, not legal or tax advice.

The invoice side of the chain, including deposits and timing, is covered in our guide to AV company invoicing.

How Do You Structure Equipment Lines?

Group equipment the way the client thinks about the show and the way your warehouse preps it. Audio, video, lighting, staging and power is the common split. For a multi-room conference, group by room first and by department inside each room, so the client can cut a breakout without you rebuilding the quote.

Decide how much detail to show. A client rarely needs every cable, but a line that says “audio package” with one price invites two problems: the client cannot see what they are buying, and a competitor’s cheaper package looks equivalent. A workable middle is to list the items a client would recognize (console, speakers, microphones, projectors, screens) and roll cable, stands and adapters into one package line per department.

Give every line the same fields: quantity, days on the job, unit rate (list price for one unit for one billed day), multiplier (how many day rates you are billing) and line total. Days and multiplier are separate on purpose. Gear that is on site for a load-in day and a show day may bill as one day or as two, depending on your rate card. A week may bill as three or four day rates. Showing both columns tells the client what they are getting and how it was priced. How to choose the multiplier is covered in our guide on how to price AV equipment rentals.

How Do You Quote Labor on an AV Job?

Quote labor by position, not as a lump. Each line should answer five questions: which position, how many people, which days or calls, what the rate covers, and what happens when the day runs long.

  • Position. Project manager, audio engineer, video engineer, lighting technician, stagehand. Use the names your client will see on the call sheet.
  • Call. Load-in, rehearsal, show, load-out. A tech on a full day rate and a stagehand on a minimum call are different lines.
  • Hours basis. State whether a day is 8, 10 or 12 hours, and whether meal breaks count.
  • Rate. A day rate or an hourly rate with a minimum call.
  • Overtime terms. The rate after the basis, the billing increment, and who can approve it on site.

Then add the labor costs that are easy to forget: travel days, per diem, hotel, mileage and parking. If the job needs them, they belong on the quote as lines.

What you pay crew and what you bill the client are different numbers. Our article on AV technician day rates covers the cost side, including wage data and a worked example of turning a day rate into a quoted labor line.

How Do You Quote Transport, Consumables, Sub-Rentals and Fees?

Transport. Quote by vehicle and trip: one truck, delivery and return. State what is included (driver, fuel, standard distance) and what is billed at cost (parking, tolls, dock fees).

Consumables. Tape, batteries and tie line are sold, not rented. List them with quantities.

Sub-rentals. Gear you bring in from another company carries a hard cost on every job. Keep it in its own section, quote it from the supplier’s confirmed price for the actual dates, and exclude it from blanket discounts. Charge for collection and return.

Damage waiver or insurance. State the options the client has (their certificate of insurance, a deposit, a waiver sold as a line, or a combination) and what the waiver does and does not cover. Have your broker and attorney review that wording.

Tax. Show tax as its own line and calculate it by jurisdiction. The treatment of equipment rental, labor and delivery differs from state to state, and it can turn on how the job is structured. Two examples we read: the Louisiana Department of Revenue says that when the facts show the essence of a transaction is the performance of a service, a rental with an operator is treated as a non-taxable service, and it lists factors that suggest a service, without treating them as conclusive. Pennsylvania’s regulation on rentals starts from a presumption that equipment furnished with an operator transfers the right to use the equipment, which can be rebutted by establishing that the work is exclusively under the control of the person who furnished the equipment and operator. Neither page is about AV specifically. Keep equipment and labor on separate lines, and take the tax question to your accountant for the state where the show happens.

An AV Quote Template You Can Copy

The job below is hypothetical: a one-day corporate general session in a hotel ballroom, with load-in the day before. It uses the same kind of show as the template in our pull sheet guide, because the accepted quote is what the warehouse pulls against. Every rate, quantity, percentage and policy in it is a placeholder, not market data or recommendations. Copy the structure, then replace the lines and numbers with your own.

Quote: Q-0000 (hypothetical) | Revision: 2 | Issued: ____ | Valid until: ____ (30 days from issue)

Client: Example Corp | Billing contact: ____ | Job owner: ____

Event: Example Corp General Session | Venue: Hotel ballroom | Load-in: Tue 2pm | Show: Wed 8am to 5pm | Load-out: Wed 5pm to 10pm

Scope: Audio, projection and stage wash lighting for one general session room, with crew for load-in, show and load-out. Not included: rigging, venue power charges, internet, recording, breakout rooms.

How to read the lines: line total = quantity x unit rate x multiplier. “Days” is how long the item or person is on the job. “Multiplier” is how many rates are billed. In this example, equipment is on site for two days and billed as one show day.

LineSectionItemQtyDaysUnit rateMultiplier or discountLine total
A1AudioDigital audio console, 16 channel12$250.001.0$250.00
A2AudioPowered main speaker with stand42$75.001.0$300.00
A3AudioPowered subwoofer22$90.001.0$180.00
A4AudioWireless handheld mic kit42$85.001.0$340.00
A5AudioWireless lavalier kit22$85.001.0$170.00
A6AudioAudio cable and accessory package12$120.001.0$120.00
AudioAudio subtotal$1,360.00
V1VideoProjector with standard lens22$600.001.0$1,200.00
V2VideoProjection screen with dress kit22$275.001.0$550.00
V3VideoVideo switcher12$350.001.0$350.00
V4VideoPlayback laptop22$125.001.0$250.00
V5VideoConfidence monitor with floor stand12$150.001.0$150.00
V6VideoSignal and cable package12$180.001.0$180.00
VideoVideo subtotal$2,680.00
L1LightingLED wash fixture42$45.001.0$180.00
L2LightingLighting console12$150.001.0$150.00
L3LightingStands, clamps and cable package12$110.001.0$110.00
LightingLighting subtotal$440.00
EquipmentOwned equipment at list$4,480.00
D1EquipmentContract client discount, owned equipment only1$4,480.0010% discount-$448.00
EquipmentOwned equipment, net$4,032.00
S1Sub-rentalsLED wash fixture, sub-rented42$60.001.0$240.00
S2Sub-rentalsSub-rental collection and return12$95.001.0$95.00
Sub-rentalsSub-rentals subtotal (no discount)$335.00
B1LaborProject manager, load-in and show days, 10-hour day rate12$650.002.0$1,300.00
B2LaborAudio engineer, load-in and show days, 10-hour day rate12$550.002.0$1,100.00
B3LaborVideo engineer, load-in and show days, 10-hour day rate12$550.002.0$1,100.00
B4LaborLighting technician, load-in and show days, 10-hour day rate12$500.002.0$1,000.00
B5LaborStagehand, load-in call and load-out call, 5-hour minimum at $45.00 per hour22$225.002.0$900.00
LaborLabor subtotal$5,400.00
T1TransportBox truck with driver, delivery trip and return trip12$225.002.0$450.00
T2TransportParking and tolls, estimate, billed at cost12$60.001.0$60.00
TransportTransport subtotal$510.00
X1ConsumablesGaff tape, roll4$22.001.0$88.00
X2ConsumablesBatteries for wireless32$1.501.0$48.00
X3ConsumablesTie line and labels1$25.001.0$25.00
ConsumablesConsumables subtotal$161.00
W1Damage waiverDamage waiver on net owned equipment plus line S11$4,272.0010% of base$427.20
TotalsSubtotal before tax$10,865.20
TotalsSales tax, per jurisdiction____
TotalsTotal$10,865.20 plus applicable tax
TotalsDeposit due on acceptance (50% of subtotal before tax)$5,432.60

Labor terms: Day rates cover up to 10 hours on site, including one 30-minute meal break. Time beyond 10 hours is billed at 1.5 x the implied hourly rate (day rate divided by 10), in 30-minute increments. Stagehand calls beyond the 5-hour minimum are billed at the hourly rate. No overtime is included in this quote. Hours beyond the basis, including any pre-show call or time on the load-out, are billed per these terms.

Terms and assumptions (placeholders, have an attorney review your own):

  1. Validity. This quote is valid until the date shown above. Equipment and crew are not held until the quote is accepted and the deposit is received.
  2. Deposit and payment. 50% deposit due on acceptance (placeholder). Balance due ____ days from invoice date.
  3. Cancellation. Cancellation more than ____ days before load-in: ____. Within ____ days: ____% of the quoted total. Within ____ days: ____%. Sub-rental and crew costs already committed are billed in full.
  4. Overtime. Billed per the labor terms above, based on actual hours, when the schedule runs past the times shown.
  5. Changes. Additions or removals after acceptance are priced on a numbered change order and approved in writing by ____ before they are supplied. On site, ____ may approve changes for the client.
  6. Power. Client or venue provides ____ within ____ feet of the stage. Venue power charges are not included.
  7. Rigging. No rigging is included. All equipment is ground supported. Venue rigging, if required, is quoted and billed separately.
  8. Venue access. Price assumes dock access, a working freight elevator, a clear room at the load-in time shown, and no venue-required labor. Delays outside our control are billed as waiting time at the labor rates above.
  9. Loss and damage. The damage waiver covers ____ and does not cover ____. Without the waiver, the client provides a certificate of insurance for ____.
  10. Tax. Sales tax is calculated per jurisdiction at invoice and is not included in the subtotal.

Accepted by: ____ | Title: ____ | Signature: ____ | Date: ____

Note how the discount is a named line that applies to owned equipment only, and the damage waiver is calculated on a stated base.

Which Terms Prevent Disputes?

Many quote disputes are about something the price silently assumed. The terms block exists to say those assumptions out loud.

  • Validity period. Rates, availability and sub-rental prices move. An expiry date gives you a clean reason to requote.
  • Deposit. State the amount, when it is due, and that nothing is held without it.
  • Cancellation. Tie the fee to how close the cancellation is to load-in, and say that committed third-party costs are billed regardless.
  • Overtime basis. The hours a day rate covers, the rate after that, the increment, and who can approve it.
  • Change orders. How a change is requested, priced and approved, and who on the client side has authority on show day.
  • Power, rigging and venue assumptions. What you expect to find when the truck arrives: power, dock, elevator, a clear room, rigging points, house labor rules, internet.
  • Exclusions. Naming what is not included (recording, breakout rooms, union labor, venue fees) is as useful as listing what is.

What Quoting Mistakes Cost AV Companies Margin?

Missing assumptions. The quote says “projection” and the venue turns out to need a long-throw lens, a lift and a rigging call. If the quote stated a throw distance, a ground-supported screen and no rigging, the extra work is a change order. If it stated nothing, it is an argument.

No expiry date. A quote with no validity period can come back accepted months later, after your sub-rental supplier raised prices and the dates filled up. In many shops this is the cheapest fix available: one date field.

Absorbed overtime. The show runs two hours long, the crew is paid for it, and the invoice goes out at the quoted number because nobody wants the conversation. Overtime terms on the quote, plus a person named to approve it on site, turn that into a routine line on the invoice.

Bundled discounting. A percentage off the bottom of the quote discounts labor, trucking and sub-rentals, which have cash costs behind them. Apply discounts to named sections and show them as lines.

No revision numbering. The client signs revision 1, the warehouse pulls from revision 3, and the invoice is built from revision 2. Number and date every revision, state what changed, and make sure acceptance names the revision being accepted.

A simple check before sending: hand the quote to someone who was not on the sales call and ask what the client is getting, for how long, and what would cost extra. If they cannot answer from the page, neither can the client.

Software that runs itself, your way. Start with the production workflow that costs you the most time, and explore whether Stagera fits your process. If that workflow is quoting, see our AV rental software page, then bring a real job to a Stagera walkthrough and evaluate the workflow you want to improve.

Frequently Asked Questions

What should an AV quote include?

An AV quote should include a header with quote number, revision, issue date and expiry date, the event and venue details, a short scope summary, equipment lines grouped by department, labor lines by position with an hours basis and overtime terms, transport, consumables, sub-rentals, a damage waiver or insurance line, any discounts shown as lines, a subtotal, tax and total, the assumptions and terms, and an acceptance block.

What is the difference between an AV quote and an estimate?

In common usage, an estimate is an early approximation given before the scope is settled, and a quote is a priced offer for a defined scope that holds until a stated expiry date. Companies and clients use the words differently, so say on the document itself whether the price is fixed and until when. Whether either one is binding depends on its wording and on local law.

How long should an AV quote be valid?

There is no standard period. Many shops choose a period short enough that equipment availability, crew availability and sub-rental prices are unlikely to have changed, and the template above uses 30 days as a placeholder. Whatever you choose, print the expiry date on the quote and state that nothing is held until acceptance and deposit.

Should labor and equipment be separate on an AV quote?

Yes, in most cases. Separate lines let the client see what each part costs, let you apply discounts to equipment without discounting crew, and make overtime and change orders easier to bill. Tax treatment of equipment rental and labor can also differ by state, so keeping them apart gives your accountant what they need.

How do you handle changes after a quote is accepted?

Price each change on a numbered change order that references the accepted quote and revision, and get written approval from a person the client has authorized before supplying it. On show day, agree in advance who can approve changes on site. Then carry every approved change order onto the final invoice.

Sources

Ready to run production without the chaos?

Join production companies running real shows on Stagera. Full platform access, no charge until day 15.