What Is a Pull Sheet? How AV Warehouses Prep Gear for a Show
A pull sheet is the warehouse's working list for one job. Get a copyable template and see how it differs from a pack list, load list and prep sheet.
A pull sheet is the warehouse’s working list for one job: every item, quantity, accessory and spare that has to come off the shelf, be tested, and go into a case before the truck loads. It is generated from the confirmed order, and it is the document the warehouse marks up as gear is actually pulled. A finished pull sheet shows what was ordered, what really went, which specific units went, and who pulled them.
Terminology varies by shop. Some warehouses say pull list, pick list, prep sheet or just “the paperwork,” and some use one document for jobs that other shops split into three. What follows describes common practice, not an industry standard.
What Is on a Pull Sheet?
A typical pull sheet carries:
- Job header. Job number, client, venue, prep, load, show and return dates, and the job owner.
- Line items. Each piece of gear with the quantity ordered, grouped by department, room or system.
- Quantity pulled. Written by the person pulling, not copied from the order.
- Serial number or asset tag. For serialized gear, which specific unit went out.
- Case or container. Which road case, rack, trunk or cart the item was packed into.
- Tested. A mark that the item was powered up and checked, with initials.
- Pulled by. Initials for each line or each section.
- Notes. Substitutions, shortages, sub-rented items and known quirks.
Accessories are where pull sheets earn their keep. A projector is a line. Its lens, power cable, remote and mount are also lines, or they belong to a kit that somebody has checked.
When Is the Pull Sheet Generated?
In most shops, the pull sheet comes from the confirmed quote or order, not from a draft. Pulling against a draft ties up gear another job may need and creates rework when the scope changes.
The order itself is usually built from upstream documents: the client’s request, a site survey, and for entertainment work the technical rider. The rider says what the act needs, the order says what you agreed to supply, and the pull sheet says what the warehouse has to put in cases. Carry forward the notes that matter (a lens throw, a console preference, a long cable run).
Timing is a shop decision. A common pattern is to release the pull sheet a few days before load: late enough that the order has settled, early enough to solve shortages.
Pull Sheet vs Pack List vs Load List: What Is the Difference?
These documents overlap, and plenty of shops combine them. Separate them by who uses each one, when, and what it proves afterward.
| Document | Who uses it | When | What it proves |
|---|---|---|---|
| Pull sheet | Warehouse staff pulling gear | From order confirmation through prep | What was pulled against what was ordered, which units, and by whom |
| Prep sheet | Prep techs, department leads | During prep and test, after or alongside the pull | That gear was powered, configured and tested as a system (in many shops this is a column on the pull sheet, not a separate form) |
| Pack list | Whoever packs, then the crew on site | At packing, then at unpacking on site | What is inside each case or container, so the crew can find things without opening everything |
| Load list | Truck loader, driver, lead on site | At the dock, at the venue, and at load-out | Which cases and loose pieces went on which truck, usually counted by container and sometimes in load order |
| Bill of lading or delivery note | Driver, carrier, client or venue receiver | At handover | That custody passed from one party to another, with a signature. A bill of lading is a carrier document; for your own trucks, a signed delivery note is the common equivalent |
| Return or check-in sheet | Warehouse staff receiving the truck | When the job comes back | What came back against what went out, in what condition, and what is missing or damaged |
The short version: the pull sheet is about items leaving shelves, the pack list is about items inside cases, and the load list is about cases inside trucks. The check-in sheet closes the loop.
A Pull Sheet Template You Can Copy
The job below is hypothetical: a one-day corporate general session in a hotel ballroom. Quantities are illustrative, not a design recommendation. Copy the structure, then replace the lines with your own inventory names.
Job: Example Corp General Session (hypothetical) | Venue: Hotel ballroom | Prep: Mon | Load: Tue 2pm | Show: Wed | Return: Thu am | Job owner: ____
| Line | Item | Qty ordered | Qty pulled | Serial or asset tag | Case or container | Tested | Pulled by | Notes |
|---|---|---|---|---|---|---|---|---|
| A1 | Digital audio console, 16 channel | 1 | Load show file if one exists | |||||
| A2 | Powered main speaker | 4 | 2 mains, 2 delays | |||||
| A3 | Speaker stand | 4 | Check locking pins | |||||
| A4 | Powered subwoofer | 2 | ||||||
| A5 | Wireless handheld mic kit | 4 | Confirm frequency coordination for venue | |||||
| A6 | Wireless lavalier kit | 2 | Include clips and windscreens | |||||
| A7 | Spare wireless handheld | 1 | Spare, same band as A5 | |||||
| A8 | Lectern mic with base | 1 | ||||||
| A9 | DI box, stereo | 2 | Laptop audio | |||||
| A10 | Laptop audio cable, 3.5mm to dual 1/4 in | 2 | Commonly forgotten | |||||
| V1 | Projector with standard lens | 2 | Verify lens against throw distance | |||||
| V2 | Projection screen with dress kit | 2 | Count legs, braces and hardware | |||||
| V3 | Video switcher | 1 | ||||||
| V4 | Playback laptop | 2 | Primary and backup, chargers included | |||||
| V5 | Confidence monitor with floor stand | 1 | ||||||
| V6 | Presentation remote | 2 | One spare, with receiver | |||||
| V7 | Signal extender or converter set | 2 | Include power supplies | |||||
| V8 | Video adapter kit | 1 | Count adapters against kit card | |||||
| L1 | LED wash fixture | 8 | Sub-rented: 4 units, see note below | |||||
| L2 | Lighting stand or truss upright | 2 | Include base plates and safety cables | |||||
| L3 | Lighting console | 1 | ||||||
| L4 | Clamps and safety cables | 10 | 8 plus 2 spare | |||||
| C1 | XLR cable, 25 ft | 20 | ||||||
| C2 | XLR cable, 50 ft | 6 | ||||||
| C3 | Video cable, 6 ft | 6 | ||||||
| C4 | Video cable, long run | 4 | 2 in use, 2 spare | |||||
| C5 | DMX cable, 25 ft | 10 | Include terminator | |||||
| C6 | Network cable, 50 ft | 4 | ||||||
| C7 | Power cable, 25 ft | 12 | ||||||
| C8 | Power strip | 8 | ||||||
| C9 | Cable ramp | 4 | Door crossings | |||||
| X1 | Gaff tape, black | 4 | Consumable, not returned | |||||
| X2 | Batteries for wireless | 32 | Consumable, enough for rehearsal and show | |||||
| X3 | Tie line or cable ties | 1 | Consumable | |||||
| X4 | Tool and tester kit | 1 | Cable tester, multitool, labels, marker |
Sign-off: Pulled complete by ____ on ____ | Prep and test complete by ____ on ____ | Open shortages: ____
Give spares their own lines so they are counted, not assumed. Give consumables a line even though they will not come back. And leave the working columns blank on the printed sheet: one that arrives with “qty pulled” already filled in is a copy of the order.
What Happens When Gear Is Short or Substituted?
Shortages are normal. The pull sheet makes the shortage visible early, as long as people write down what they actually found.
A common practice is to handle it in three steps:
- Record the gap. Write the real quantity pulled.
- Decide the fix with the job owner. Substitute an equivalent item, sub-rent, or change the design. The warehouse should not silently swap gear that changes how the show runs (a different lens, a different wireless band).
- Write the substitution on the sheet. Note what replaced what, and tell the lead on site. Otherwise check-in will show one item missing and one unexplained extra.
Sub-rented items
Sub-rented gear deserves its own marking on the pull sheet, as in line L1 above. Note the vendor, the quantity, and the vendor’s own identifiers if the units are not tagged in your system. Keep the vendor’s cases and accessories identifiable through the whole job, because they go back to the vendor, often on a deadline.
What Is the Prep and Test Step?
Pulling confirms the gear exists. Prep confirms it works together. In practice that means powering units up, patching the system roughly as it will run on site, loading show files, pairing wireless, and confirming signal paths with the actual cables and adapters going out.
What matters is that “tested” means a person saw it work and put initials next to it. A failed unit found on the prep bench becomes a swap. The same failure found at the venue becomes an emergency.
How Do Kits and Containers Fit In?
Listing every adapter on every job gets tedious, so many shops build kits. The kit appears as one line on the pull sheet, and a kit card inside the lid lists the contents.
Kits only work if someone counts them. Check the contents against the card at prep and again at check-in.
Recording that the lectern mic is in the audio workbox, case 4 of 9, turns a twenty-minute search on site into a short walk. It also feeds the pack list and load list.
How Do You Handle Last-Minute Changes?
Changes after the pull has started are where version problems begin. The client adds a breakout room, and the sheet on the clipboard no longer matches the order.
Practices that help:
- One current version. Date and number each revision. Collect the old copy.
- Show the delta. A change list (“add 2 handhelds, remove 1 confidence monitor”) beats comparing two full sheets.
- Put adds on the sheet, not on a sticky note. Anything that leaves the building without a line cannot be checked back in.
Why Does Pull Accuracy Matter?
An AV job is assembled once, at a venue, on a deadline. A wrong pick shows up as a missing piece at load-in, with the warehouse an hour away.
We could not find published AV-specific data on pull accuracy. The figures below come from general warehousing; read them as context, not a benchmark for your shop.
The Warehousing Education and Research Council (WERC) publishes an annual DC Measures benchmarking study. According to a white paper from Yale Lift Truck Technologies summarizing the 2025 report, best-in-class order picking accuracy was 99.68% or higher, with best-in-class defined as the top 20% of survey respondents. Note the source: it is a vendor’s summary of an industry survey, and it covers distribution centers, not rental warehouses.
On how the picking method affects errors, a 2025 peer-reviewed laboratory study in the journal Sensors compared a paper list with two assisted methods that required the picker to confirm each pick. With paper and no confirmation step, 28 participants made 48 errors across 700 picks (6.86%). The two confirmed methods recorded 2.31% and 1.18%. The limits are important: the participants were students, not experienced warehouse staff, the setting was a lab, and only 28 of the 71 participants did the paper run. Both assisted methods also guided the picker to the location with a light, one confirmed with a button and the other by scanning a barcode at the bin location with a wrist scanner. Neither scanned a tag on the item itself. It suggests that guidance plus a confirmation step at the moment of the pick reduces errors for new pickers. It does not isolate the confirmation step, and it does not predict your error rate.
Paper or Scanning?
Paper works. It is cheap, and a marked-up sheet with initials is a real record. Its weaknesses are familiar: handwriting, lost pages, stale versions, serial numbers copied by hand, and nothing that stops a person from ticking a line for the wrong item.
Scanning replaces the tick with a confirmation that this specific tagged unit was the one pulled. In general terms, that helps with serial capture and with catching the wrong model. It also has costs: everything needs a tag, tags wear off, bulk cable and consumables are awkward to scan, and a scanned item can still be broken. Scanning does not replace prep and test.
Plenty of shops run a hybrid, with serialized gear scanned and bulk items counted. For more on tagging and tracking, see our AV equipment tracking guide.
What Happens at Return and Check-In?
The pull sheet’s last job is to be the baseline for the return. Check-in compares what came back against what actually went, including substitutions, late adds and sub-rented units.
Record three things for every discrepancy: what is missing or damaged, what the evidence is (a photo, a note from the crew lead), and what happens next. Write damage notes specifically. “Broken” does not help the repair bench. “Left latch bent, lid will not close” does. Then hold damaged units out of available stock.
Reconcile promptly. The reasons, and a wider set of process changes, are in our guide on how to reduce equipment loss in AV rental.
Software that runs itself, your way. Start with the production workflow that costs you the most time, and explore whether Stagera fits your process. If warehouse prep is that workflow, start at our equipment tracking software page, then bring a real job to a Stagera walkthrough and evaluate the workflow you want to improve.
Frequently Asked Questions
What is the difference between a pull sheet and a pack list?
A pull sheet is the warehouse’s working list of items to take off the shelf for a job, marked up as gear is pulled. A pack list describes what is inside each case or container once it is packed. Some shops use one document for both.
Is a pull sheet the same as a pick list?
In most AV shops, yes. “Pick list” is the more common term in general warehousing, and “pull sheet” or “pull list” is common in AV rental and live production. Usage varies by company.
Who is responsible for the pull sheet?
Commonly, the job owner or project manager is responsible for the order being right, and the warehouse is responsible for pulling and recording against it. The person who pulls each line should initial it. Scope questions go back to the job owner.
Should consumables and spares be on the pull sheet?
Yes. Tape, batteries and tie line are easy to forget because they are not rental inventory. Giving them and your spares their own lines means they are counted like everything else, and consumables can be marked as not expected back.
How far ahead should gear be pulled?
It depends on the shop, the size of the job and how tight inventory is. A common approach is to pull a few days before load, so shortages surface while a substitution or sub-rental is still possible. Pulling too early can hold gear another job needs.